Simulate, Verify & Optimize

Lifting Equipment & Rigging Verification

Rigging calculations and FEA verification of lifting beams, lugs, bolted connections and custom lifting equipment — including tight certification deadlines.

Lifting equipment has to be demonstrably safe before it is used, and the calculations are often on the critical path to certification. We verify lifting beams, spreader bars, lifting lugs, bolted and welded connections and complete rigging arrangements, and document the results for review.

Our work covers sling force and lifting point calculations — including the effect of center-of-gravity uncertainty — as well as FEA of the equipment itself. For heavy equipment we also verify storage, road, rail and sea transport load cases, including longitudinal, transverse and quartering accelerations.

Verification is carried out against the applicable requirements, such as EN 13155, DNV, ISO 19901-5, Eurocode and the Machinery Directive 2006/42/EC.

What we analyze

  • Rigging and sling force calculations with CoG uncertainty
  • FEA of lifting beams, spreader bars and lifting lugs
  • Bolted and welded lifting connections
  • Transport load cases: road, rail and sea
  • Support for accelerated certification timelines

What you receive

  • Calculation and FEA report structured for certification review
  • Utilization and safety factors per standard and load case
  • Recommendations where margins are insufficient

Lifting Equipment & Rigging Verification case studies

Questions

Lifting Equipment & Rigging Verification FAQ

Can you help with lifting equipment certification?

Yes. We provide the rigging calculations and FEA verification that certification requires, documented against EN 13155, DNV, ISO 19901-5 and the Machinery Directive as applicable. The certificate itself is issued by your certifying body.

Can you work to a tight certification deadline?

Yes — we have delivered rigging calculations and primary FEA verification of custom lifting equipment within an accelerated timeframe to meet a certification deadline. Contact us early with the deadline so the scope can be planned around it.