Failure & Fatigue Investigation

Leveling Beam

Root-cause investigation of a cracked concrete leveling beam: vibrator frequencies were exciting the beam's natural frequency.

Modal FEA stress plot of the leveling beam next to a photo of the cracked beam in service
Modal FEA stress plot of the leveling beam next to a photo of the cracked beam in service

Challenge & approach

Addressed a critical issue with a concrete leveling beam showing signs of failure after three months. Our investigation revealed resonance as the cause: frequencies from concrete vibrators coincided with the structure's natural frequency.

Outcome

Detailed fatigue investigation pinpointed crack formation locations and contributing factors.

Have a similar engineering challenge?

Send us a short description, drawings or CAD and the standard you need to meet. We reply within 24 hours.

Contact Us